Within the project of constructing Sarajevo bypass, ‘’Regeneracija’’ has participated in all previous activities. On Lot 1 activities of drainage of routes and objects for which polyester manholes, drains, and separators were produced and installed.

Drainage objects which include: Biješće viaduct, viaduct Reljevo, viaduct Oštrik, overpass Jošanica, ramp Butile A, B, C, D, viaduct Rječica,
overpass Reljevo in total length of 3079.00 meters.

Manufacturing, transport, and installation of polyester drains, manholes, and separators was conducted for LOT 2A.